
03 / SERVICE
Water
& sewer infrastructure
Watermain, sewer main and service connections are different assets with different requirements. Establish the ownership boundary, drawings and approvals before defining the construction scope.
CONNECTION / HANDOFF
Join the system.
Clarify the boundary.
Infrastructure work becomes clearer when ownership, connection points and the next inspection or trade are shown as one sequence.
PROJECT BRIEF
What needs
to be visible.
Is all water and sewer work included?
The work must be confirmed against the project requirements. Excavation, installation, connections, testing, disposal and restoration should each be identified in the agreed scope.
Drawings, specifications and the responsible asset owner
Connection points and existing infrastructure
Permit, access and traffic-control responsibilities
Testing, restoration and handover requirements
NEXT STEP
Define the scope before the equipment.
Share the location, the work you need completed and the information already available. We’ll use that to frame the next conversation.
Discuss the project

