PROJECT BRIEF
Show the before and the intended after.
Bring the site plan
Include the available grading or servicing drawing and the proposed excavation. Flag nearby drainage features and any design questions still with the consultant.
Record existing surfaces
Photograph paving, landscaping, access routes and the work area. State what must be protected and the finish expected after the underground work.
Assign reinstatement
Identify who handles backfill, compaction, final surfacing and any required inspection or records. Confirm these interfaces before the work is scheduled.
RELEVANT SERVICES
LOCAL QUESTIONS
Useful before
the call.
Does a small excavation mean drainage can be ignored?
The size of the opening alone does not settle the impact. Show the proposed work against the site’s levels and drainage features. Richmond Hill’s guidance is a useful starting point for checking the applicable process.
Where can I check site-alteration requirements?
Use Richmond Hill’s site-alteration permit information and speak with the City about the actual proposal. The scope and exemptions depend on the work; a contractor inquiry does not determine permit eligibility.
NEXT STEP
Bring the site into focus.
Share the location, the work you need completed and the information already available. We’ll use that to frame the next conversation.
Discuss the project
EXCAVATE → RESTORE